Which family first
partition C/U, ceiling T, furring/hat, and villa frames are different hosts.


Light-gauge keel package: partition stud and track, ceiling T-grid, furring, or a villa frame line. Example below is a high-speed stud-and-track mill: 4+16 stands, 0.39-0.81 mm, up to 70 m/min.
Drywall and ceiling plants that roll light-gauge studs, tracks, T-grid or furring from coil and need a clear host for year-one volume.
partition C/U, ceiling T, furring/hat, and villa frames are different hosts.
many plants run a wall line and a ceiling line; a CU combined mill is a different quote.
punch count and web pattern follow the drawing.
One delivered example. Final numbers follow your quotation.
| Example line | High-speed stud and track host from a delivered specification |
|---|---|
| Material | GI 0.39-0.81 mm; small lip on the section drawings |
| Former | Cast stands 4+16 / shaft Dia. 70 / GCr12 / gearbox drive |
| Punch / cut | 5 hydraulic punch stations + 1 cut; full web dimples by die |
| Speed | Up to 70 m/min on this example (hole count and stacker still affect the job) |
| Infeed / out | Dual-head hydraulic decoiler 3 t + inkjet + automatic stacker with PP strap |
| Power / HMI | 380 V / 50 Hz / 3-phase / PLC / EN and ES |
Dual-head hydraulic decoiler, 3 t class, for light-gauge coil.
Five stations before or with the cut; round or slot and dimple pattern follow the drawing.
Cast 4+16 stands, Dia. 70 GCr12, gearbox drive.
Hydraulic cut on the example line.
Inkjet plus automatic stacker with PP strap on the example order.
| Step | Module | Guidance | Related |
|---|---|---|---|
| Primary | High-speed stud and track line | 4+16 / Dia. 70 / 0.39-0.81 mm / up to 70 m/min | Stud and track forming |
| Alternative | CU combined keel line | C and U changeover on one mill; separate quotation | CU stud forming |
| Related product | Furring / hat channel line | Ask for the furring package | Ceiling furring forming |
| Related product | Villa LGS frame line | Thicker C-class frames; own punch map | Villa LGS stud forming |
| Infeed | Hydraulic decoiler | Example: dual-head 3 t | Hydraulic decoiler |
| Out | Auto stacker + PP strap | Example order includes inkjet and PP packing | Stud-track strapping |
Partition stud/track vs CU combo vs ceiling T vs furring vs villa frame, one high-speed stud-and-track specification, equipment matching, and a quote checklist.
Light-gauge drywall coil is a different host from structural C/Z purlin lines.
Prefab-house frames use a thicker C-class and their own dies. C50 stud numbers stay on the stud quotation.
A plant that sells both partition and T-grid usually buys two hosts.
Partition stud/track, ceiling T-grid, furring and villa frames are different hosts. The example below is high-speed stud and track only.
Dedicated stud plus dedicated track, or one CU combined mill. The high-speed example on this page is a stud-and-track class; CU changeover is a separate quotation.
From the quotation that matches that delivered line. Ceiling T, furring and villa lines use their own files.
Send the quote checklist. Commercial terms come back on the offer.
No questions yet