

Start from the core material and bonding method the finished panel must ship — not from a generic “sandwich panel machine” label. Polyurethane full-core foam, PU-edged rockwool, and EPS/rockwool glue composite share a catalog neighborhood but use different station lists, footprints, and power sheets. Industry type guides make the same split by continuous vs discontinuous plants and by PU/PIR vs mineral wool vs EPS cores; use that as background, then open the matching encyclopedia page.
After the family is fixed, confirm profile drawings (roof vs wall), thickness range, and whether edge sealing is mandatory. Those three checks prevent most cross-fill mistakes before anyone opens a speed table.
| Primary need | Lean toward | Then confirm |
|---|---|---|
| Best thermal / cold-chain volume | PU continuous (or belt hard-foam variant) | Double-belt vs belt hard-foam tier; footprint ~90×20 m class |
| Non-combustible / fire walls (A1 core path) | Rockwool — PU-edge continuous if sealed edges & throughput matter; glue if simpler plant | Edge seal yes/no; automation of rockwool handling |
| Budget / non-fire-critical | EPS glue composite | Manual core feed; ~5 vs short-table ~0–4 speed bands |
| Mixed plant (thermal + fire zones) | Often two configurations, not one hybrid number sheet | Separate BOMs and separate ratings pages |
Yes as a capacity check for continuous vs compact glue plants — but core code and fire/thermal duty still come first. A high-m² fire wall still wants rockwool, not a pasted PU foam sheet.
No. Say whether you need full-core continuous foam, PU-edged rockwool, or glue composite (EPS or rockwool boards). Ambiguous wording invites mixed numbers.
Some commercial packages claim multi-core flexibility, but encyclopedia ratings stay on named configurations. If the project truly needs two products, expect two process stories — not one averaged speed table.
Inside the PU continuous family as a separate speed/power tier (~2–6 m/min; ≥35 kW). Choose them after you already know the core is polyurethane foam — see the speed-tier page.
Selection Q — no invented ratings. Final figures follow the confirmed proposal for the named configuration. Price and lead time are out of scope.