Table of Contents
- Two timing variants
- Why timing matters
- Package notes (keep ratings on home pages)
- Inquiry checklist
- Buyer FAQ
- Verification notes
- References
1. Two timing variants
Online (pre-form) punching holes the flat strip with servo feed before the section is fully formed. Post-form punching hits the shaped channel after roll forming (including offline dual-press layouts on some seismic packages).
On the 41-series family these are configuration variants — not a reason to invent a new machine family name.
2. Why timing matters
- Hole edge quality and tool access depend on whether the web is still flat
- Press tonnage, die set, and servo pitch change with timing
- Tracking cut vs stop cut often couples to the chosen punch path
- Do not assume every strut quotation uses the same punch station position
3. Package notes (keep ratings on home pages)
| Package | Punch-timing note |
|---|
| 41-series | Online or post-form documented as variants |
| Cassette | Servo + ~125T typically before cassette forming |
| TJ20 | Online punch then form + tracking shear; flying-saw package may omit online punch |
| Seismic | Package-1 online + tracking saw; package-2 offline dual punch after form |
Speed and kW still belong on each package’s own encyclopedia page — this Q page does not merge them.
4. Inquiry checklist
- Hole map on flat vs on finished channel
- Online press vs offline dual press
- Coupled cut method (tracking / flying / stop)
- Which sibling package (41 / cassette / TJ20 / seismic) owns the RFQ
5. Buyer FAQ
Does post-form punch need a different LINE name?
No for the 41-family FAQ — it is a timing/config variant.
Can I copy cassette 125T into every online-punch quote?
No. Tonnage follows the named package table.
Seismic offline punch equals BRACKET?
No — still strut / U41 evidence.
6. Verification notes
- Publish only numbers that appear on the named FAQ / parameter sheet for this leaf.
- When two source documents disagree, list both tiers with labels — do not average.
- Host ratings stay separate from auxiliaries (curving, stacking, offline presses) unless the FAQ bundles them.
- Directory identity is fixed; open fields stay blocked until a proposal confirms them.
Final ratings follow the named technical proposal. Price and lead time are out of scope.