

Buyers sometimes request a “C channel machine” without saying whether they need structural purlins for a steel building or light-gauge wall studs / tracks for interior framing. Those are different equipment families. Thickness, punching layout, drive power, and line speed cannot be copied from one family onto the other.
| Equipment family | Typical output | Thickness context (documented / common) |
|---|---|---|
| C / Z purlin lines | Roof and wall purlins for steel buildings | Commonly about 1.0–3.0 mm on standard packages; heavy variants go higher — confirm per proposal |
| U channel lines | Structural U / channel sections | Often about 2.0–3.0 mm on flying-shear class references |
| C/Z interchangeable lines | Both C and Z on one line with changeover | Multiple tiers — confirm per proposal; do not paste C-only numbers blindly |
| Light-gauge stud / track lines | Interior framing members | Much thinner coil (often below 1 mm for partitions; some LGS packages extend higher for villa frames) — do not reuse purlin power or speed claims |
Public manufacturer explainers draw the same line: CZ purlins for secondary structural members on industrial spans often sit around 1.5–3.0 mm, while stud-and-track partition machines commonly advertise about 0.4–1.2 mm for interior walls. Light-gauge villa framing packages may go thicker than partition studs, but they remain a different product path from C80–300 structural purlin mills. Use this as market orientation only — commercial ratings stay on the named proposal.
No. Light-keel CU packages belong with stud/track framing, not with structural U channel lines.
Only as two separate machine paths (or two clear BOMs). Mixing ratings in one parameter table causes wrong power and thickness answers.
See the C purlin, Z purlin, U channel, and (when published) light-gauge stud encyclopedia entries for family-specific ratings.
Not if the quote is a C/Z interchangeable line. That is still a structural-section path — not a stud/track mill.
This page is a boundary map, not a single machine parameter sheet. Final ratings follow the confirmed proposal. Price and lead time are out of scope.