1. Purpose
Produce slotted angle / shelf-angle strip with an integrated hole pattern and formed section in one continuous path. The exact station list follows the confirmed flow sheet — Chinese tech notes and English India quotations are not identical BOMs.
2. Chinese recommended short flow
- Load / decoil
- Feed strip into roll-punch entry rolls
- Roll punch (hole pattern)
- Discharge into the next station
Chinese recommended ratings on that path: ~25 mm × ~1 mm, ~50 m/min, main ~5.5 kW, shaft ~φ100.
3. English India quotation flow
- Decoiling (~3T hydraulic auto decoiler language)
- Feeding / guiding
- Rotary punching (~15 kW; shaft ~φ150)
- Roll forming (~11 kW; ~12 stands; shaft ~φ60)
- Hydraulic cutting (~5.5 kW + servo ~3 kW)
- Run-out tables (~3 m × 2 cited)
Working speed language ~0–60 m/min including cutting process — do not silently replace the Chinese ~50 m/min tier.
4. Decision gates before quoting
- Which flow sheet is active (Chinese short vs English full line)?
- Is the hole map rotary-capable or does it need CNC punch?
- Cut tolerance and exit table length required?
- Do not import post-punch-only line ratings into this flow.
5. Buyer FAQ
Why do motor splits disagree?
Chinese notes may show one main motor total; English India docs split punch, form, and cut drives — treat as variant, not a math error.
Is hydraulic cut always present?
On the English full-line flow yes; the Chinese short note centers on decoiler + roll-punch — confirm BOM.
Can Australian manual modes redefine the BOM?
No. Level/cut/rewind modes in the manual are operator options, not a second unique quotation.
6. Verification notes
- Publish only numbers that appear on the named FAQ / parameter sheet for this leaf.
- When two source documents disagree, list both tiers with labels — do not average.
- Host ratings stay separate from auxiliaries (curving, stacking, offline presses) unless the FAQ bundles them.
- Directory identity is fixed; open fields stay blocked until a proposal confirms them.
Final ratings follow the named technical proposal. Price and lead time are out of scope.