This page maps the shared process spine for steel scaffold walking-board (plank) roll forming: coil handling, optional punching or embossing, progressive forming, and cut-to-length. Equipment pages keep the locked m/min and kW figures; this entry explains where those figures attach on the shop floor.
Public walkboard explainers list the same seven-station idea (decoil → level → servo → punch → form → cut → exit). Treat them as industry context; station names and options still follow the named proposal.
| Configuration | Process emphasis | Speed story (equipment pages) |
|---|---|---|
| C225 / YX38-225 | Punch stretch holes → form → hydraulic cut | About 5–10 m/min recommended |
| Punched + tracking (GY160 class) | Continuous press punch → form → tracking cut | About 1–6 m/min |
| Hanging / hoist-change multi-profile | Punch + hydraulic end notch → dual hanging formers → reshape / cut | CN with punch about 8–12; some RU sheets about 5 — do not lock one |
| Dual-width spacer boards | Punch → form; width change by spacers | About 6–10 m/min on that sheet |
| Checkpoint | What to confirm |
|---|---|
| Punch before form? | Hole map / emboss / end notch drawings |
| Cut mode | Stop shear vs hydraulic tracking / flying |
| Changeover | Fixed roller set, spacer kits, or whole hanging frame swap |
| Power split | Forming host vs punch vs hyd vs installed total — never merge labels |
Speeds and kilowatts stay on the equipment encyclopedia pages for each configuration. This flow page does not re-lock them.
No. Some markets use embossed or plain boards. Punched anti-slip and drainage is a configuration choice driven by the finished drawing.
After forming, as a flying / tracking hydraulic cut synchronized with strip speed. It replaces a simple stop-shear package when that option is selected.
Multi-profile hanging plants often punch head/tail notches (and sometimes logo or connection holes) before the strip enters the hanging former.
Not usefully. Punch density, cut mode, and changeover hardware dominate cycle time and power more than stand count alone.
Final ratings follow the named technical proposal. Commercial price and lead time are out of scope.