Produce punched rack column profiles to length with connector slot patterns aligned to beam hooks. This flow is upright-only. Beam form-then-cut (and box clinch) sequences stay on the beam process page.
Connector-plate punching / folding and brace or beam hosts are companion lines — not steps on this host.
Pre-punching on the flat strip is the industry default for teardrop / slot pitch accuracy. Post-form punching on a finished upright risks wall distortion and pitch drift. Why punch-first is explained on the dedicated Q page.
When comparing speed tiers, confirm whether the figure includes punch and shear time — punch cadence often limits effective output more than forming alone.
| Item | Option1 recommended (do not lock all variants) |
|---|---|
| Speed | About 0–10 m/min (other sheets ~0–6 / ~0–14 / ~5–10) |
| Forming / hyd / total | ~22 kW dual / ~5.5 / ~40 kW |
| Stands / shaft | ~16 / φ70 (option2: chain, φ90 class) |
| Thickness note | ~3 mm on option1; other docs ~1.5–2.5 — confirm proposal |
No. Beams usually form then cut (box adds clinch). Uprights insert a dense punch pattern before forming.
Mechanical presses are common on upright references. Confirm press type and capacity on the named proposal.
Often yes. Quote the upright package speed that already includes punching — do not advertise pure forming speed alone.
Companion lines in a full rack plant — not stations on this upright flow.
Process map only. Final ratings follow the named upright proposal. Price and lead time are out of scope.