On structural C, Z, and C/Z interchangeable purlin lines, punching is a standard process stage, not a rare option. Connection holes, slots, and custom patterns are typically punched into the flat strip after leveling / feeding and before roll forming so hole positions stay tied to the finished section drawing.
Industry pre-punch vs post-punch guides make the same point: pre-punch on flat strip is the usual choice for standardized C/Z purlin bolt patterns; post-punch after forming is reserved for special geometry. Hydraulic punch banks synchronized by PLC are the common hardware class on documented structural purlin schemes.
Documented structural sequence:
Applications. Structural purlins that must leave the plant with connection holes already placed for bolting to frames and overlapping members. Hole layout is buyer-drawing driven — the machine does not invent a universal pattern.
| Host class | Speed note that includes punch / shear | Related power reminder |
|---|---|---|
| Dedicated C (Automatic baseline) | Forming about 0–18 m/min; production with punch/shear about 0–12 m/min | Main about 15 kW |
| Dedicated Z (Automatic baseline) | Forming about 0–18 m/min; production about 0–10 m/min with punch/shear | Main about 18.5 kW on Automatic; alternate quote about 15 kW |
| CZ interchangeable Standard / New | Forming about 0–15; production about 0–12 | Main about 18.5 kW; hyd about 7.5 kW |
| CZ interchangeable Quickly | Forming about 0–25; production about 0–18 | Main about 22 kW |
| CZ large English note | About 25 m/min without punch vs about 12 m/min with punch | Confirm on that proposal |
Hydraulic power follows the punch / shear package on each quotation (for example flying-saw C variants list separate saw and hydraulic motors). Do not read a “forming only” number as the net plant output when punch and shear are online.
Typically after leveling / feeding and before roll forming, so holes are placed on flat strip to the drawing.
Because production notes already include punch and shear cadence. Example: C baseline forming about 0–18 m/min vs production about 0–12 m/min with punch/shear.
Yes in principle — punch remains a standard stage; some CZ schemes list two hydraulic punch groups. Always re-check tooling after a C↔Z changeover.
The buyer drawing / project connection design. The line executes the loaded punch program; it does not invent a universal hole map.
If a quotation offers both pre-punch and post-punch options, name which one is on the BOM. The structural baselines documented here assume punching before forming unless the contract says otherwise.
Final ratings follow the confirmed technical proposal. Price and lead time are out of scope.