A hoist-change (or interchangeable) two/three-wave guardrail line produces both W-beam and thrie-beam panels by swapping forming hosts / roll sets on a shared entry–punch–exit system. It is a separate host proposal from dedicated single-wave lines.
Market change-over designs lift whole stand banks or adjust the last stations and change cutting dies — downtime and single-host risk are the trade-offs versus two dedicated lines.
| Item | Dedicated W2 / W3 | Hoist-change dual |
|---|---|---|
| Profiles | One wave count per host | Both waves on one footprint |
| Main motor examples | ~30 kW (W2) / ~45 kW (W3) | Follow dual proposal — do not paste dedicated kW |
| Speed guidance | ~15 m/min form; ~10 with punch-shear | Often about 5–10 m/min with punch/shear |
| Thickness guidance | Conflict across sheets — not locked | Often about 3–4 mm — still confirm |
No — state hoist-change / interchangeable dual explicitly. A vague “guardrail” RFQ is usually read as dedicated single-wave.
No. Dual guidance is often about 5–10 m/min with punch/shear. Keep source labels separate.
Often lower CapEx than two dedicated hosts, but changeover downtime and shared-line risk must be priced into the plant plan. Commercial quotes stay on the proposal — not on this page.
No. Hoist-change only covers wave-count tooling. Project auxiliaries remain separate stations.
Final ratings follow the named dual proposal. Commercial quotes and lead time are out of scope.