Convert coil into punched, formed, cut-to-length W-beam or thrie-beam highway guardrail panels. This page is a process map — speeds, kW, and stands stay on the named host pages (dedicated W2, dedicated W3, or hoist-change dual).
| Step | What buyers should confirm |
|---|---|
| Punch | Hole pattern / pitch from the beam drawing |
| Form | Wave count (W2 / W3) or dual hoist-change tooling |
| Shear | Front vs rear shear — changes cycle timing |
| Exit | Manual table vs auto stack as a named option |
Bending / arching, terminal-end forming, and repair / straighten are off-line auxiliaries, not steps on every host. Do not invent them into the main process string unless the proposal lists them.
On the speed-tier page / proposal — forming-only vs punch+shear included. Do not paste either figure into a vague process map without labeling the cycle.
Recommended packages punch before form. Alternate layouts exist; confirm on the named proposal.
Usually no — they are off-line project auxiliaries unless the contract bundles them.
The high-level sequence stays the same; tooling changeover replaces a second dedicated host. Speed guidance often differs from dedicated 15/10 tiers.
Process map only. Final ratings follow the confirmed proposal. Commercial quotes and lead time are out of scope.