

A hanging-type (hoist-change) scaffold plank line forms walking boards with one or more complete forming frames that can be lifted and swapped. The buyer promise is multi-profile production without re-gapping an entire fixed roller train stand by stand.
Contract English sometimes says “metal floor decking” while the BOM is hanging walking board / настил — keep it in the scaffold-plank equipment group, not structural floor decking.
Industry “cassette / quick-change” plank explainers sell the same idea: whole tooling rafts for several board sizes. That is market context for changeover intent — not a license to copy their stand counts or kW onto this proposal.
| Item | CN hanging proposal | RU contract variant |
|---|---|---|
| Speed with punch | About 8–12 m/min | About 5 m/min with punching |
| Forming power | About 37 kW | Totally power about 37 kW class |
| Hydraulic | About 15 kW (accumulator language) | Per named sheet |
| Hosts / stands | A ~36 rows; B ~26 rows; ~3 board shapes on 2 hanging machines | A/B each ~30 roller stations |
| Shaft | About φ80 mm | About φ80 mm |
| Thickness | About 1.5–2 mm (Q235 CR / GI) | About 1.5–2 mm Q235 |
| Controls brands | Yaskawa / Kunlun class listed on CN BOM | Siemens language on RU sheet |
Do not publish one locked speed. Hold CN 8–12 and RU 5 side by side until the named proposal wins.
Choose hanging / hoist-change when the plant must run several walking-board profiles in the same shop and changeover time matters more than a single fixed roller set. Dual hanging hosts (A/B) cover two roller families; some projects add a third board shape across two machines.
Spacers help height or limited width variants on a fixed family. Whole hanging frames are for deeper multi-profile swaps where roller geometry differs more than a spacer kit can absorb.
Name the proposal. CN with in-line punch cites about 8–12 m/min; some RU contracts cite about 5 m/min with punching. Publishing one number without the source sheet is incorrect.
If the BOM is hanging walking board tooling, keep scaffold-plank classification. Structural floor deck is a different product and machine group.
Two hanging formers, hydraulic notch dies, hydraulic shear, exit table; RU sheets may add marking options. Confirm against drawings.
Final ratings follow the named technical proposal. Commercial price and lead time are out of scope.