No. A gutter (eaves trough) roll forming line and a downspout / downpipe roll forming line are different machines. Gutters collect water along the eaves; downpipes carry that water vertically to grade. Industry drainage guides treat them as connected products on the roof system — not as one interchangeable mill.
| Aspect | Gutter / rain trough line | Downpipe / downspout line |
|---|---|---|
| Finished product | Horizontal eaves channel (rain gutter) | Vertical rectangular / square / round pipe |
| Typical reference flow | Decoil → guide / front shear → roll form → hydraulic cut-to-length → exit | Decoil → roll form → cut-to-length → exit; elbow / reducer bender optional |
| Speed (FAQ reference) | ~10–12 m/min (rain gutter doc) | ~8–10 m/min (YX144×108 doc) |
| Main / hydraulic (FAQ reference) | ~4.0 kW drive / ~3.0 kW hydraulic | ~4 kW forming / ~3 kW hydraulic; bender ~2.2 kW separate |
| Thickness (FAQ reference) | ~0.3–0.7 mm PPGI / GI | ~0.5–0.8 mm color steel (YX144) |
| Stands / shaft (FAQ reference) | ~18 passes; shaft ~φ70 | ~19 horizontal + vertical rolls; shaft ~φ70; flying saw cut |
These bands are quotation-tier references for rain-gutter and YX144×108 downpipe soft models. Round gutter, box gutter, YX76, and Bonnie downpipe siblings keep their own parameter files — do not merge them into one answer.
Many plants buy both lines for a local rainwater-goods package. Quote and confirm each host separately: decoiler duty, shear mode, thickness, and auxiliaries. Industry downpipe articles also note that buyers often evaluate downpipe equipment together with gutter and fascia — still as distinct machines in the same commercial package.
Not as a default. Different finished sections need different tooling paths. Treat them as two lines unless a named dual-cassette proposal explicitly covers both drawings.
No. On the YX144 reference, the ~2.2 kW bender is an auxiliary — keep it off the host forming / hydraulic rating.
Name rain, round, or box from the finished trough drawing. Sibling gutter soft models are not interchangeable parameter sheets.
Final ratings follow the named proposal. Price and lead time are out of scope.