

Listed speed depends on what the note includes. A pure forming figure is not the same as a production figure that already accounts for hydraulic punching and cut-to-length. Always ask: forming only, or punch + shear included?
| Scheme | Speed guidance |
|---|---|
| Dedicated W2 / W3 | Forming about 15 m/min; with punch and shear about 10 m/min |
| Hoist-change dual | Often about 5–10 m/min including punch/shear |
| Other scheme docs | May cite different bands — label the source proposal |
Market pages may advertise wider bands (e.g. 8–25 or 10–20 m/min) — industry context only; commercial answers stay on the named scheme above.
No — different host proposals and cycle definitions. Dual guidance already tends to include punch/shear; dedicated 15 is forming-only on the reference package.
Usually no contradiction — 15 is forming reference; 10 includes punch and shear on the same dedicated package.
Alternate scheme docs and market pages use wider bands. Keep them labeled; do not average into one invented public speed.
Heavier coil and harder grades load the cycle. Thickness bands conflict across sheets — lock both thickness and speed on the same proposal.
Final speed follows the confirmed proposal. Commercial quotes and lead time are out of scope.