

This article covers the glue configuration inside the rockwool / EPS composite panel line family. Steel faces are bonded to EPS or rockwool boards with adhesive spray and heat, then cut by flying saw — not by filling the core with high-pressure polyurethane foam.
It shares the composite family with PU-edge continuous rockwool, but uses a different process option and a different rating table.
Core boards (EPS or rockwool) are often manually fed into the composite section on the documented quotation.
Applications. Economical insulated roof / wall panels where pre-cut foam or mineral-wool boards are acceptable. Not a substitute for continuous PU full-core cold-room foam lines when the buyer needs injected polyurethane cores.
| Item | Recommended reference | Same-family short-table alternate |
|---|---|---|
| Composite / line speed | About 5 m/min | About 0–4 m/min |
| Top forming work speed (side note) | About 12 m/min on the upper roll station — not whole-line composite speed | — |
| Total power | About 50 kW | About 28 kW |
| Envelope / mass | About 40×2.5×2.8 m; about 10 t | Total length about 33 m on short table |
| Skin / coil | PPGI about 0.4–0.6 mm; coil width ≤ about 1250 mm | — |
| Panel / interlayer thickness | About 50–250 mm per customer requirement | About 50–150 mm adjustable |
| Upper host (reference) | About 14 stands; shaft about ø80; main about 3 kW; chain drive; 350# H-beam frame | — |
| Cut-off | Flying saw; cut motor about 5.5 kW; Delta-class PLC / HMI | — |
Publish both power/speed tiers side by side — do not force one unique number.
No. Cores are EPS or rockwool boards bonded by glue and heat. There is no high-pressure full-core PU injection as the main process.
They are same-family tiers (recommended English quote vs short parameter table). Name which proposal applies.
No. About 12 m/min is an upper roll-forming station work speed on the quote. Composite line speed is about 5 m/min on the recommended tier.
No. PU-edge continuous is another configuration. Keep glue ~50 kW and PU-edge ~90 kW separate.
Final ratings follow the confirmed glue-configuration proposal. Price and lead time are out of scope.