Table of Contents
- Process purpose
- End-to-end sequence
- Station notes
- Round vs push-square branch
- Checkpoints
- Buyer FAQ
1. Process purpose
Map the continuous HF ERW route from coil to cut tube. Speed, OD, and installed-power bands stay on the round or push-square equipment pages — this flow page does not invent a merged rating table.
2. End-to-end sequence
- Dual-station / dual-head decoil
- Shear & end-weld (join coils for continuous run)
- Accumulator (horizontal / spiral / cage) — buffer during coil change
- Forming (breakdown + fin-pass)
- Solid-state HF welding + squeeze
- Scarf / cool
- Sizing / straighten (round OD, or push-square / Turk-head when square/rect is selected)
- Flying saw cut-to-length
- Run-out → inspect / pack (project options)
3. Station notes
- Accumulator keeps forming/welding at constant speed while entry stops for end-weld
- HF + flying saw detail: dedicated station page
- Hydrostatic / UT / packing are often project options after the mill proper
4. Round vs push-square branch
| Branch | Sizing after weld / cool | Where ratings live |
|---|
| Round delivery | Round OD sizing / straighten | ERW-ROUND (e.g. HG76 bands) |
| Square / rect delivery | Push-square / Turk-head after rough sizing | ERW-SQUARE (e.g. 114 bands) |
Shared upstream stations do not authorize mixing downstream power or size tables.
5. Checkpoints
- End-weld quality before accumulator fill
- Weld V-angle and scarf after HF
- Diagonal / corner control when push-square is selected
- Cut-length accuracy at flying saw vs mill speed
6. Buyer FAQ
Is hydrostatic / UT part of every BOM?
Often project options after the mill proper. Confirm on the named proposal — not assumed on every structural mill.
Does this flow change for square?
Upstream is shared. Push-square adds Turk-head sizing; keep square ratings on the square page.
Where do speed numbers live?
On the round or square equipment pages — not re-locked here as a third “truth.”
Is the accumulator optional?
Continuous mills need a buffer for coil change. Exact type (horizontal / spiral / cage) follows the proposal.
Process map only. Price and lead time are out of scope.