A door-frame opening changeover is the shop procedure used when the ordered frame width (opening) changes on an already installed frame roll forming host. Typical actions are spacer / sleeve adjustment to set forming width and replacement of the matching cut-off die. It is not a full machine swap and not a shutter-slat roll-set change.
Reference packages often cite shaft about φ50; heavier same-pack docs may use about φ70 with twenty-plus stands or about φ80 with roughly eighteen stands — changeover logic is the same, duty class is not.
Recommended changeover wording:
Applications. Multi-size steel door frame shops that run several openings (examples such as 115 mm and 230 mm appear in reference docs) on one host. Market practice also uses cassette tooling and modular punch dies to shorten changeovers — industry orientation only; commercial steps stay on the named proposal.
| Item | Documented reference |
|---|---|
| Width setting | Spacer / sleeve adjustment to forming width |
| Cut-off | Matching cutter for the new opening (e.g. 115 / 230 class) |
| Punch | Recheck tooling if hinge/lock positions change with the drawing |
| Shaft (context) | Recommended package about φ50; heavier docs about φ70 / φ80 — not interchangeable duty |
| Item | Note |
|---|---|
| Main / hydraulic kW | Follow the named thickness tier; opening change alone does not redefine motor size |
| Stand count | Host geometry stays; do not invent new pass counts from a spacer note |
| Slat / guide tooling | Out of scope for frame opening changeover |
No. Hole maps and punch recipes still follow the buyer drawing. Cutter match is also required for the new opening.
No. Those sizes appear as reference examples. Contract drawings decide the openings you must support.
Not always. Many frame hosts change openings by spacer and cutter. Confirm changeover time and tooling list on the proposal.
Only if hinge/lock positions are unchanged. When the drawing moves holes, recheck punch dies and left/right recipes.
Final ratings follow the confirmed technical proposal. Price and lead time are out of scope.