

This page is a process map for steel door frame (and leaf-edge profile) production with hinge/lock features punched inline. It explains station order and quality checkpoints. kW and thickness tiers stay on the frame overview and multi-spec pages — this page does not invent a new power band.
Recommended route wording:
Some layouts punch then cut blank length before forming; others punch then form continuous strip; a few market layouts place hydraulic punch after forming — confirm the proposal layout.
Applications. Continuous production of steel door frames and leaf-edge profiles that need assembly holes before shipping. Opening changeovers (spacer + cutter) are covered on the changeover page.
| Checkpoint | What to confirm |
|---|---|
| Holes vs drawing | Match hinge/lock maps; with multiple punch groups, confirm tooling for the current order |
| Opening change | After spacer width change, confirm matching cutters |
| Speed wording | If a speed note already includes punch/cut time, do not read it as pure forming speed |
| Left / right | Verify punch recipe for handed frames when the drawing requires it |
| Item | Pointer only |
|---|---|
| Recommended package | About 0–15 m/min; main/hyd about 7.5/5.5 kW; shaft about φ50 |
| Heavy variants | About φ70/~23 stands or φ80/~18 stands — see multi-spec page |
On the changeover page when openings such as 115 / 230 change. This page only notes that cutter match is a checkpoint after width change.
Multi-group punching appears in some source wording; the exact cylinder/group count follows the named proposal.
No. Use FRAME overview / multi-spec pages for speed, power, and thickness tiers.
Typically yes — same process class. Confirm whether roll or cutter change is needed for the leaf section.
Final ratings follow the confirmed technical proposal. Price and lead time are out of scope.