This process entry describes how a coil slitting line converts one wide master coil into multiple narrower strip coils. The purpose is width division and rewind — not cross-cut sheet stacking. Industry process guides describe the same core chain: uncoiler → (leveler) → rotary knives → scrap / edge handling → tension → recoiler.
Operating sequence (common wording):
High-speed line additions. Documented high-speed automatic slitting references may insert loop buffer and head-shear sections before the slitting stand. Confirm those stations on the proposal drawing rather than assuming every slitter includes them.
Applications. Preparing slit coils for roll forming, tube, stamping, and distribution. Not a substitute CTL flow for flat sheets.
| Configuration cue | Flow richness | Documented capacity reminder |
|---|---|---|
| Simple hydraulic slitter | Basic uncoil → slit → recoil chain | About 0.38–0.8 mm × 500–1380 mm; about 0–40 m/min; about 12 strips; knife shaft about φ120 |
| ZJX-1.5×1250 | Full slit-and-recoil package | About 0.3–1.5 mm × 800–1250 mm; about 20 m/min; about 10 strips |
| ZJX high-speed 3×1600 | Uncoil → (buffer / head shear) → slit → scrap → recoil | About 0.3–3 mm × 500–1600 mm; about 0–80 m/min; installed about 250 kW class; knife shaft about φ220 |
Actual station list, loop-pit presence, and scrap-winder type follow the confirmed quotation BOM — this page is a process map, not a single BOM.
Uncoil, slit with rotary knives, handle edge trim, and recoil strips. Leveling and buffers depend on the tier.
On documented high-speed automatic slitting references. Ask for them explicitly if your material and speed need them.
No. Sheet output needs a CTL or combined slit/CTL host.
At the slitting stand: arbors, knives, and spacers are set to the order’s strip widths and count before the run.
Quality checkpoints during the flow usually include strip-width verification after knife setup, edge-burr inspection, and recoiler tension balance so outer strips do not telescope. Exact tolerance numbers follow the named technical proposal rather than a universal public table.
If the inquiry mixes sheet stacking language into a slitter flow diagram, stop and re-classify the machine before editing the station list.
Final ratings follow the confirmed technical proposal. Price and lead time are out of scope.