

This page documents the shop-floor sequence of a hoist-change box panel line with dual forming hosts. Speeds and kilowatts stay on the box panel equipment page; here the emphasis is station order and where A/B swap occurs.
Public shelf-box and box-board lines describe the same spine: decoil/level → punch/notch → form → cut/flange. Film convey and dual hanging hosts are the configuration details to confirm on the proposal.
Host A (about 24 stands) and host B (about 14 stands) are alternate roller sets for two box profiles. Hoist swap selects which host is in the pass line. This is not a second unrelated plant — it is one production system with two hanging formers.
Split roller tracks with single-side manual width trim adjust finished width within a profile family after the correct host is selected.
| Checkpoint | Reference cue |
|---|---|
| Speed / power | ~12–15 m/min; main ~7.5 kW; hyd ~5.5 kW (equipment page) |
| Width / thickness | ~350–500 mm; ~0.6–0.8 mm |
| Punch | Side notches + holes before forming |
| Exit | Cut + both-end flange |
At the forming stage: the active hanging host (A or B) is swapped into the pass line before production of that box profile.
Box beam is a structural horizontal (often C + seam). This flow is shelf box panel.
No. Film is optional on the two-roll convey section.
Not on this dual-host design. Each profile’s roller geometry lives on its own hanging host.
Final ratings follow the named technical proposal. Commercial price and lead time are out of scope.