

Describe the full combination sequence on an anti-condensation felt line: apply felt at entry, form the metal profile, cut to length, and auto-stack. Station counts and speeds are confirmed on the host page / proposal — this page is the combo flow map with plant-power reading.
Industry anti-drip roofing lines describe the same continuous path: decoiler → filming / felt device → form → shear → stacker, optionally able to run PPGI with or without felt depending on setup.
| Station | Role |
|---|---|
| Decoil + car | Feed GI/PPGI coil; ID about 450–550 mm class |
| Felt coating | Bond anti-drip membrane to the underside before forming |
| Form mill | Create roof / cladding profile without scraping the felt face |
| Hyd shear | Cut-to-length under PLC length / count control |
| Auto stack | Collect finished sheets for packing |
Because RFQs that only copy “7.5 kW” understate plant demand and confuse film-only vs combination scope.
No. That page is the compact route. This page expands station roles and plant-power reading.
Only if the named proposal says so. The documented combination baseline includes about 6 m auto stack.
On the film / anti-drip equipment host page (about φ85; about 19 + 20).
Process map only. Final ratings follow the confirmed proposal. Price and lead time are out of scope.