Source / class
2–3 wave W-beam order · Q355/Q235 class.


Module swap and pre-punch holes define this highway line.
Module swap and pre-punch holes define this highway line.
2–3 wave W-beam order · Q355/Q235 class.
3.0 mm· 477/744 →310/506 × 85· length 4000/4320/4500 · ±2 mm.
Decoil→level→shovel feed→3-station hyd punch+cut→form→hyd stop cut→convey→stack.
| Source / class | 2–3 wave W-beam order · Q355/Q235 class. |
|---|---|
| Strip / product | 3.0 mm· 477/744 →310/506 × 85· length 4000/4320/4500 · ±2 mm. |
| Flow | Decoil→level→shovel feed→3-station hyd punch+cut→form→hyd stop cut→convey→stack. |
| Infeed | Hyd decoiler+car 10T · leveler 2 pinch+7 rolls · ~11 kW. |
| Punch | 300T / 60T / 30T three machines · Cr12MoV dies · 2W/3W head/tail + oval holes. |
| Form | Portal gearbox · Φ110 / 40Cr · Cr12MoV rolls · 22 kW×2 · 0–10 m/min · 2 roll sets. |
| Cut / stack | Post-form hyd stop cut 15 kW · H13 · 4 m conveyor · lift stacker. |
| Power / color | Total ~138 kW· 380 V/50 Hz · RAL7016 frame / RAL3003 cabinet & portal / yellow guards. |
ID 508–610 class, press arm engaged.
2+7 leveler feeds the strip into the shovel/feed.
Head/tail long holes, mark hole, mid holes — three stations in series.
Change the cassette or labeled modules to switch wave profile.
The line uses a post-form hydraulic stop cut for clean, square ends.
4 m roller table into the lift stacker.
2/3-wave W-beam line: 3.0 mm, pre-punch 3 stations, swap modules, hyd stop cut, stacker.
The auxiliary punch/level line and fence panel run on their own pages — see Related processes.
Show both 2-wave and 3-wave modules so the swap is clear on the board.
The hole pattern is punched upstream of the forming stands.
Send us your profile sizes, gauge and daily output — we return a sized proposal with lead time.