Build
Proboard4″ and 6″· auto size change specified.


The size-change demo with both Proboard boards is the priority; the HF wall cladding sibling runs on its own page.
The size-change demo with both Proboard boards is the priority; the HF wall cladding sibling runs on its own page.
Proboard4″ and 6″· auto size change specified.
Cast stands · 45# chrome · chain · hydraulic cut · main7.5 kW· hyd5.5 kW· PLC · ZH/EN.
220 V / 60 Hz / 3φ· blue + yellow guards.
| Build | Proboard4″ and 6″· auto size change specified. |
|---|---|
| Host | Cast stands · 45# chrome · chain · hydraulic cut · main7.5 kW· hyd5.5 kW· PLC · ZH/EN. |
| Power / color | 220 V / 60 Hz / 3φ· blue + yellow guards. |
| Infeed | 5 Tmanual decoiler. |
| Design note | Specification calls for auto change; show the as-built changeover as the key demo. |
| Related sibling | HF wall cladding auto-change task on the same order runs on its own page. |
Both widths labeled beside the host.
The full changeover clip is the priority of this page.
Cast stands / chain; confirm the live width tag.
Nameplate + 5 T manual decoiler shot.
Paint gate before marketing stills.
Keep the work on the soffit profile through packing, distinct from HF wall cladding.
Proboard 4″/6″ soffitwith auto model change on 220 V/60 Hz 3φ, 5 T manual, blue+yellow.
HF wall cladding, wall panel, power wall and vent panel each run on their own dedicated lines.
Send us your profile sizes, gauge and daily output — we return a sized proposal with lead time.
Request a quote