SKU class
7 t electric decoiler ×1.


One mandrel, electric drive, expand-by-plates, brake on stop. Controls include enable, jog, and feed.
One mandrel, electric drive, expand-by-plates, brake on stop. Controls include enable, jog, and feed.
7 t electric decoiler ×1.
Frame 80×160×3.75 square tube · mandrel 80×14 seamless tube · expand 50×50×5.
Bearing 6215 · four-segment expand plates.
| SKU class | 7 t electric decoiler ×1. |
|---|---|
| Frame / mandrel | Frame 80×160×3.75 square tube · mandrel 80×14 seamless tube · expand 50×50×5. |
| Expand | Bearing 6215 · four-segment expand plates. |
| Drive | Main motor 3 kW · VFD 4 kW. |
| Stop | Brake (required). |
| Electrics (specification) | 350 V / 50 Hz / 3φ. |
| Lead time (spec) | 15 days. |
7 t single-head capacity. Confirm coil ID/OD and approach clearances for this install.
Four-segment expand plates with 6215 bearings. Center the coil before VFD ramp-up.
Main motor 3 kW through VFD 4 kW. Jog first, then run continuous payoff.
Feed strip into the downstream former. Control loop height and start/stop timing.
Use the brake on stop to prevent loose tails. Confirm coast vs braked stop behavior during commissioning.
Confirm expand, jog, continuous run, and brake stop against the published 7 t / 350 V specification.
350 V / 50 Hz / 3φ.
not a dual-mandrel indexing host.
Send us your profile sizes, gauge and daily output — we return a sized proposal with lead time.
Request a quote