Global B2B Roll Forming Sourcing Platform | Free RFQ Response within 24h

Sign InJoin FreeMy OrdersKnowledgeSupplier CenterMessagesHelp
Language
  • English - en
Currency
    ZTRFM
    • Popular Search
    • Cold Roll Forming Machine
    • Press Brake
    • Plate Bending Roll
    • Hydraulic Punching Machine
    • Decoiler
    Process Library · Coil Handling & Decoiling

    Electric Decoiler (7T Motorized)

    One mandrel, electric drive, expand-by-plates, brake on stop. Record enable / jog / feed.

    Electric decoiler7 ton motorized uncoilerVFD decoilerfour segment expand decoiler

    What this process looks like

    One mandrel, electric drive, expand-by-plates, brake on stop. Record enable / jog / feed.

    SKU class

    SKU class

    7 t electric decoiler×1.

    Frame / mandrel

    Frame / mandrel

    Frame80×160×3.75square tube · mandrel80×14seamless tube · expand50×50×5.

    Expand

    Expand

    Bearing6215·four-segment expand plates.

    Specifications

    SKU class7 t electric decoiler×1.
    Frame / mandrelFrame80×160×3.75square tube · mandrel80×14seamless tube · expand50×50×5.
    ExpandBearing6215·four-segment expand plates.
    DriveMain motor3 kW· VFD4 kW.
    StopBrake(required).
    Electrics (specification)350 V / 50 Hz / 3φ— verify on nameplate.
    Lead time (spec)15 days.
    Same order — excludeDual-layer roof former · 5T manual decoilers on that host.

    Operation steps

    Load the single head

    Load the single head

    7 t specification. Record approach and eye size—avoid assuming a dual-head rotate or coil car if this install has none.

    Expand with four plates

    Expand with four plates

    Four-segment expand plates + 6215 bearings. Off-center coils walk when VFD ramps—gate before enable.

    Enable electric drive

    Enable electric drive

    3 kW motor through 4 kW VFD. Jog first, then run—this is the buyer’s specification, not a hydraulic pump story.

    Motorized payoff

    Motorized payoff

    Strip into the next specification (often a former). Loop height and start/stop are the focus.

    Brake on stop

    Brake on stop

    Sheet requires brake. Record coast vs braked stop—loose tails whip without it.

    Tag dual-layer separately

    Tag dual-layer separately

    Same order has a dual-layer roof former with 5T manual stands. Don’t paste that host as this electric decoiler.

    Key details

    Power & voltage

    Decoiler specification says 350 V; dual-layer sibling says 380 V. Don’t silently overwrite—verify nameplate and publish the verified value.

    Safety & controls

    No remote rotate of two heads here. If the head shows dual mandrels indexing, you’re on the wrong process page.

    FAQ

    How is the forming frame built?
    Frame80×160×3.75square tube · mandrel80×14seamless tube · expand50×50×5.

    Get a configured quote

    Send us your profile sizes, gauge and daily output — we return a sized proposal with lead time.

    Request a quote